University of Utah PCEB

GC

Okland

Fabricator

Cives Steel

Structural EngineeR

Saiful Bouquet

This academic building utilized DuraFuse Frames to minimize the steel tonnage for a steel moment frame building while greatly improving the resilience of the structure. Having a connection that is field-bolted shortens the erection schedule so the building will be open to fulfill its educational purpose.

Recent Projects

Sharp Innovation

San Diego, California

The Sharp HealthCare Prebys Innovation and Education Center (PIEC) in San Diego, California provides hand-on…

EdgeCore Data Center

San Jose, California

Data centers cannot afford to be offline and this 250,000 SF data center in San Jose, California needed brace-free…

Clearfield Library

Clearfield, Utah

Winner of the 2022 Most Outstanding Project Award from Utah Construction and Design (public project under $10M)…

Durango Health Center

Las Vegas, Nevada

DuraFuse Frames provide tremendous value, even in low-seismic situations. The Durango Cullinary…

SLCC

West Jordan, Utah

The Student Center at the Jordan Campus of Salt Lake Community College (SLCC) had complicated geometries…

North Logan Med Center

Logan, Utah

While medical office buildings are not required by code to be operational after an earthquake, why not build in…