2400 Sand Hill Office Building

GC

Devcon

Fabricator

Glazier Steel

Structural EngineeR

Miyamoto International

This office building takes advantage of the ease with which DuraFuse Frames integrates with mass timber. Eliminating seismic lateral beam bracing and having a small protective zone made it simple to bring the steel and timber together while maintaining economy and functional recovery

Recent Projects

Sharp Innovation

San Diego, California

The Sharp HealthCare Prebys Innovation and Education Center (PIEC) in San Diego, California provides hand-on…

EdgeCore Data Center

San Jose, California

Data centers cannot afford to be offline and this 250,000 SF data center in San Jose, California needed brace-free…

Clearfield Library

Clearfield, Utah

Winner of the 2022 Most Outstanding Project Award from Utah Construction and Design (public project under $10M)…

Durango Health Center

Las Vegas, Nevada

DuraFuse Frames provide tremendous value, even in low-seismic situations. The Durango Cullinary…

SLCC

West Jordan, Utah

The Student Center at the Jordan Campus of Salt Lake Community College (SLCC) had complicated geometries…

North Logan Med Center

Logan, Utah

While medical office buildings are not required by code to be operational after an earthquake, why not build in…